Over 80% of UPS failures are preventable with regular maintenance. Sukhai UPS provides structured preventive maintenance visits for all UPS brands — covering cleaning, battery health checks, impedance testing, thermal imaging, firmware updates, and load verification. Scheduled PM keeps your power protection operating reliably between breakdowns, not instead of repairs.

Call +91-98208-43000
25+
Years of Experience
5,000+
Clients Served
50+
Cities Covered
4.9★
Average Rating
The Case for Preventive Maintenance

Why Preventive Maintenance Matters

Studies of UPS failure data consistently show that the majority of UPS system failures — over 80% — are attributable to causes that would have been detected and corrected during a routine preventive maintenance visit. These include battery degradation, clogged air filters causing overheating, loose connections generating heat, fan failures that lead to thermal shutdown, and firmware bugs that cause erratic behaviour.

Preventive maintenance reduces downtime in three ways: it identifies developing faults before they cause failure; it keeps the UPS operating at the efficiency levels it was designed for; and it ensures the battery system is at full health, so that when mains power fails, the UPS performs as expected.

PM extends UPS life significantly. A well-maintained UPS operating in a clean, temperature-controlled environment with properly charged batteries can easily achieve 10–15 years of service life. A neglected UPS in the same environment may fail within 5–7 years. The cost of regular PM is a small fraction of the cost of premature UPS replacement.

PM prevents battery failures — the single most common cause of UPS failure. VRLA batteries are sensitive to temperature, charging voltage, and depth of discharge. Regular PM checks all these factors and flags batteries showing signs of degradation before they fail completely, giving you time to plan a replacement rather than reacting to an emergency.

PM Checklist

What Our PM Visit Includes

Every Sukhai UPS preventive maintenance visit follows a comprehensive, documented checklist covering all major UPS subsystems and the battery bank.

Visual Inspection

Full visual check of UPS chassis, internal components, battery terminals, intercell connections, input/output cabling, and earthing connections. Signs of overheating, corrosion, bulging components, or physical damage are recorded.

Internal Cleaning

Removal of accumulated dust from fans, air filters, heat sinks, and internal compartments using ESD-safe compressed air. Clean fans and filters are critical for cooling efficiency and preventing thermal shutdown.

Battery Voltage & Impedance Testing

Float voltage measurement for all battery blocks. Impedance/conductance testing per cell using calibrated test equipment. Results compared against baseline and manufacturer thresholds to identify degraded cells.

Thermal Imaging

Infrared thermography scan of all major internal components, bus bars, connections, and battery cells. Hot spots that are invisible to the naked eye are detected and their severity assessed. Thermal images are included in the service report.

Load Test & Output Verification

Output voltage, frequency, and waveform distortion (THD) measured under live load. Transfer to bypass and back verified. For systems with extended battery banks, a timed discharge test verifies runtime against specification.

Firmware Check & Update

Current firmware version checked against latest manufacturer release. Applicable updates applied during the PM visit. Firmware updates often include performance improvements, bug fixes, and enhanced compatibility with modern monitoring systems.

Replacement Recommendations Report

Detailed service report provided after every visit documenting all measurements taken, findings, and graded recommendations (immediate action required, advisory, or watch). Enables informed planning of maintenance expenditure.

How Often to Maintain

PM Frequency Recommendations

The right PM frequency depends on how critical the protected load is, the age of the UPS and batteries, and the environmental conditions.

Quarterly PM — Critical Systems

Recommended for hospitals, data centres, banking operations, and manufacturing. Four PM visits per year ensures the highest level of readiness. Each visit is comprehensive and includes thermal imaging and battery impedance testing.

Semi-Annual PM — Commercial Systems

Recommended for offices, educational institutions, hotels, and commercial buildings. Two visits per year — typically before the monsoon season (May/June) and before winter (October/November) — keep the system in good condition for Indian climate conditions.

Annual PM — Light Office Use

Minimum recommended frequency for small office UPS systems where occasional short outages are tolerable. Annual PM checks batteries, cleaning, and electrical measurements. Increase to semi-annual as batteries age beyond 2 years.

Increase Frequency as Battery Ages

VRLA batteries degrade faster in their third and fourth year of life. We recommend increasing PM frequency from annual to semi-annual when batteries are 2+ years old, and to quarterly when over 3 years, regardless of the system criticality level.

Battery Health

Battery Condition Assessment

Battery failure is the most common cause of UPS system failure. Our PM visits include a thorough battery condition assessment using multiple testing methods.

Battery Impedance Testing

Impedance (internal resistance) is measured per cell using an AC conductance tester. As a VRLA battery ages, its internal resistance increases. Cells showing impedance values greater than 25% above baseline are flagged as degraded. This test is non-invasive and can be performed without taking the UPS offline.

Float Voltage Verification

Float charging voltage is measured per string and per block. Incorrect float voltage — either too high or too low — accelerates battery degradation significantly. We adjust charger set points if readings are outside the manufacturer's recommended range.

Thermal Check of Battery Strings

Thermal imaging is applied to battery strings to detect cells that are running hotter than their neighbours. Hot battery cells indicate a cell under stress — either due to high internal resistance, electrolyte loss, or thermal runaway — and should be replaced promptly.

When to Replace Batteries

Based on our test results, we provide a clear replacement recommendation. Batteries showing impedance 25% above baseline, delivering less than 80% of rated capacity, or visually bulging or leaking should be replaced. We supply and install replacement batteries from Exide, Quanta, Amaron, and Leoch as part of our battery replacement service.

Multi-Brand PM

Preventive Maintenance for All UPS Brands

Our engineers are trained and experienced on all major UPS platforms sold in India. One PM contract can cover your entire UPS fleet regardless of brand mix.

APCSmart-UPS, Galaxy
Eaton5PX, 9PX, 93PM
EmersonVertiv Liebert series
BPEAll models
NumericLegrand / Numeric
DeltaAmplon, Ultron
LuminousAll UPS models
MicrotekAll UPS models
FAQ

UPS Preventive Maintenance — Common Questions

For critical systems such as hospitals, data centres, and banking operations, quarterly PM visits (4 per year) are recommended. For normal commercial applications, semi-annual PM (2 per year) is sufficient. For light office use where UPS is not powering mission-critical loads, an annual PM visit is the minimum. Always increase PM frequency as batteries age beyond 2 years.
A standard UPS PM visit includes visual inspection of UPS, batteries, and cabling; internal cleaning including dust removal from fans and air filters; battery voltage and impedance testing for all cells; thermal imaging of internal components and connections; output voltage and load test; firmware check and update if required; and a detailed service report with replacement recommendations.
Battery impedance testing (also called conductance testing) measures the internal resistance of each battery cell without taking it offline. As VRLA batteries age, their internal resistance increases, which reduces their ability to deliver power during a discharge. High internal resistance indicates a degraded battery. By comparing impedance readings against baseline values, engineers can identify weak cells before they fail during a power outage.
Thermal imaging (infrared thermography) detects abnormal heat signatures inside the UPS. Loose connections, overloaded components, failing capacitors, and weak battery cells all generate excess heat that is invisible to the naked eye but clearly visible on a thermal camera. Early detection allows the fault to be corrected before it causes a failure. Thermal imaging is especially valuable on 3-phase industrial UPS systems and large battery banks.
Yes. Regular preventive maintenance directly extends battery life. PM visits check and correct float charging voltage (overcharging and undercharging both degrade VRLA batteries), clean battery terminals to prevent resistance buildup, check for thermal runaway conditions, and identify individual weak cells before they damage adjacent healthy cells. Well-maintained batteries typically achieve their full 3-5 year design life, whereas neglected batteries may fail in 1-2 years.
Related Services

Related Services

UPS AMC Services

Get scheduled PM visits plus emergency breakdown cover all in one Annual Maintenance Contract. All brands, 4–8 hour response, genuine spare parts.

View AMC Services →

UPS Battery Testing

Standalone battery impedance and discharge load testing service. Predict battery failure before it happens. Available as a separate service or included in PM visits.

View Battery Testing →

UPS Repair Services

When PM finds a fault that needs repair, our engineers fix it. On-site and depot repair for all UPS brands with 30-day repair warranty.

View UPS Repair →

Also see: UPS Installation  |  SMF Batteries  |  Battery Replacement

Schedule a UPS PM Visit

Tell us your UPS brand, model, and site location. We'll schedule a PM visit at a time that suits you and have your system fully inspected and documented within 48 hours of booking.

+91-98208-43000 WhatsApp Us